Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Toilet Shown - Drawing amd Design CAD - Past Exam Paper, Exams of Engineering Drawing and Graphics

Main points of this past exam are: Toilet Shown, Office And Toilet, Universal Beam, Universal Colunn, Corregated Roof Sheeting, Portal Roof Frames, Insulation, Placed, Cavity Wall, Raker Pile

Typology: Exams

2012/2013

Uploaded on 04/30/2013

karthik
karthik 🇮🇳

4.6

(16)

95 documents

1 / 6

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Cork Institute of Technology
Higher Certificate in Engineering in Building Services Engineering – Award
National Certificate in Engineering in Building Services Engineering - Award
(NFQ – Level 6)
Autumn 2005
Drawing & Design (CAD) Paper 1
(Time: 4 Hours)
Instructions
Answer Q1 and Q2 and ONE other question.
Examiners: Mr. T. Dunne
Dr. N. J. Hewitt
Mr. D. Sheehan
NOTE:- YOUR COMPUTER MUST NOT BE TURNED ON WHEN ATTEMPTING
QUESTION 1.
Q1. On your answer books supplied, answer the following questions on Building Services
Drawing and Cad:-
(a) Indicate on a Structural Steel building where a UNIVERSAL BEAM (UB), and a
UNIVERSAL COLUNN (UC) would be used.
(b) Indicate on a brief sketch, how PVC CORREGATED ROOF SHEETING is secured
to PORTAL ROOF FRAMES.
(c) Give a brief description of how a CROPPING SHEET (say A1) is inserted on a
Autocad drawing with limits of 84000,60000.
(d) How do reduce the size of STANDARD TITLE block when installing on a Autocad
drawing?
(e) Can a drawing in DOS called PUMP. BAK be brought up in AUTOCAD.
(f) Indicate 3 ways of joining PIPES together.
(g) What is a WALLPLATE ?.
(h) What is the standard rise and thread of an internal STAIRSCASE?
pf3
pf4
pf5

Partial preview of the text

Download Toilet Shown - Drawing amd Design CAD - Past Exam Paper and more Exams Engineering Drawing and Graphics in PDF only on Docsity!

Cork Institute of Technology

Higher Certificate in Engineering in Building Services Engineering – Award

National Certificate in Engineering in Building Services Engineering - Award

(NFQ – Level 6)

Autumn 2005

Drawing & Design (CAD) Paper 1

(Time: 4 Hours)

Instructions Answer Q1 and Q2 and ONE other question.

Examiners: Mr. T. Dunne Dr. N. J. Hewitt Mr. D. Sheehan

NOTE:- YOUR COMPUTER MUST NOT BE TURNED ON WHEN ATTEMPTING

QUESTION 1.

Q1. On your answer books supplied, answer the following questions on Building Services Drawing and Cad:-

(a) Indicate on a Structural Steel building where a UNIVERSAL BEAM (UB), and a UNIVERSAL COLUNN (UC) would be used.

(b) Indicate on a brief sketch, how PVC CORREGATED ROOF SHEETING is secured to PORTAL ROOF FRAMES.

(c) Give a brief description of how a CROPPING SHEET (say A1) is inserted on a Autocad drawing with limits of 84000,60000.

(d) How do reduce the size of STANDARD TITLE block when installing on a Autocad drawing?

(e) Can a drawing in DOS called PUMP. BAK be brought up in AUTOCAD.

(f) Indicate 3 ways of joining PIPES together.

(g) What is a WALLPLATE****?.

(h) What is the standard rise and thread of an internal STAIRSCASE?

(i) What is the differance between a (^) BLOCK and a (^) WBLOCK in Autocad?

(j) What is an ANGLE CLEAT?

(k) What is the standard fall for drainage pipes?

(l) Sketch how DAMPROOFING is done over a window on a typical cavity block wall.

(25 Marks)

NOTE:- QUESTION 1. MUST BE HANDED UP TO THE

SUPERVISOR BEFORE ATTEMPTING QUESTION 2. DO NOT

TURN ON YOUR COMPUTER BEFORE THEN.

Q2. Shown on attached (FIG.1.) is a drawing of a portion of a Plan view of an Industrial Factory Loading Bay, with a ramp to the upper level. Draw the following:-

(a) the portion of the Plan shown on Fig .1 (attached).

(b) indicate the external drainage from the WC, WHB, and SHOWER, showing GT’s, MH’s, AJ’s, etc where required. The 100 mm. dia. PVC drain is to run in a west direction, under the path running beside the Ramp.

(c) indicate a suitable position for a Boiler House, to cater for the heating system for the Office and Toilet shown on Fig.1., and 3 Offices overhead on the First Floor Level (not shown.).Show positions of Radiators on the Ground Floor Office, and Toilet. NOTE:- Where dimensions have been omitted use the Scale given on Fig.1. attached. WBLOCKS may be used for standard items like door opes, windows etc.

Save your work onto a floppy disc on A:drive under the title PIPING DWG. (50 Marks)