Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

PMT 4800V EXAM 2025 WITH 100% ACCURATE SOLUTIONS, Exams of Nursing

PMT 4800V EXAM 2025 WITH 100% ACCURATE SOLUTIONS

Typology: Exams

2024/2025

Available from 06/15/2025

GradeGuardian
GradeGuardian 🇬🇧

218 documents

1 / 39

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
PMT 4800V EXAM 2025 WITH 100% ACCURATE SOLUTIONS
What is used to create the Acquisition Program Baseline? –
Answer Defense Acquisition Visibility Environment (DAVE)
For a mass-production system, the majority of a system’s life
cycle costs can be attributed directly to – Answer Operations
and Support Costs
Which technical review is required for a successful Milestone B
prior to the Engineering and Manufacturing Development
Phase and occurs when all major design issues have been
resolved in the system preliminary design and work can begin
on detailed design? – Answer Preliminary Design Review (PDR)
Which of the following is a mandatory evaluation factor in
every source selection? – Answer Cost
Select the document that establishes policies and procedures
for developing, reviewing, validating and approving the
capability documents required by the Joint Capabilities
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27

Partial preview of the text

Download PMT 4800V EXAM 2025 WITH 100% ACCURATE SOLUTIONS and more Exams Nursing in PDF only on Docsity!

PMT 4800V EXAM 2025 WITH 100% ACCURATE SOLUTIONS What is used to create the Acquisition Program Baseline? – Answer Defense Acquisition Visibility Environment (DAVE) For a mass-production system, the majority of a system’s life cycle costs can be attributed directly to – Answer Operations and Support Costs Which technical review is required for a successful Milestone B prior to the Engineering and Manufacturing Development Phase and occurs when all major design issues have been resolved in the system preliminary design and work can begin on detailed design? – Answer Preliminary Design Review (PDR) Which of the following is a mandatory evaluation factor in every source selection? – Answer Cost Select the document that establishes policies and procedures for developing, reviewing, validating and approving the capability documents required by the Joint Capabilities

Integration and Development System (JCIDS). – Answer Chairman of the Joint Chiefs of Staff Instruction (CJCSI)

A software costing method that uses a team of experts working both independently and together to combine different approaches and arrive at a collective judgment through consensus is an example of the _________ costing method. – Answer Delphi You have been assigned to lead a new program. Your first order of business is to introduce team members and set expectations to establish the team. In which stage of the team life cycle process are you operating? – Answer Forming During the Operational Test (OT) effort, the purpose of validation is to determine ________________. – Answer Whether or not we have “built the right thing” The _______ includes details of processes, procedures, and materials used in fabrication and is usually controlled by the contractor. – Answer Product Baseline

managed acquisition programs? – Answer DoDI 5000.02, Operation of the Adaptive Acquisition Framework A design that optimizes ease and economy of fabrication and assembly would be considered: - Answer Producible You are a new team lead for an existing team with job satisfaction issues. Using an outside party, you collect a list of specific issues that employees say make the job dissatisfying, such as a lack of recognition. You then create a matrix to plan how to increase satisfaction, such as arrange for high-ranking officials to meet the team, learn about their contributions, and attend events where they are recognized for their accomplishments. You are operating based on the principles of which theory of motivation? – Answer Expectancy Theory Which agency apportions budget authority to the Department of Defense’s (DoD’s) comptroller on a periodic basis? – Answer Office of Management and Budget For the following activity description, identify the problem solving process step with which it is associated: reflect on

potential sources of assistance and resistance to the proposed solution. – Answer Develop an Implementation Plan Which ONE of the following types of problem solving tools graphically depicts the relationship between the problem and its causes, and can be used to help determine the problem’s root cause(s)? – Answer Cause-and-Effect Diagram (or Fishbone Diagram) Who provides an independent assessment of the effectiveness and suitability of new weapon systems? – Answer Director, Operational Test & Evaluation (D,OT&E) What is the primary objective of the Joint Capabilities Integration and Development Systems (JCIDS)? – Answer To ensure that capabilities required by the warfighter are identified and meet operational performance criteria Who has the authority to issue a written order directing contractor to make a change without prior agreement? – Answer Contracting Officer

aspects, such as how the system will be tested, supported, and operated, and the team outlines a high-level training plan to be implemented while the system is being developed. This reflects which tenet of Integrated Product and Process Development (IPPD)? – Answer Concurrent development of products and processes Which of the following design features is NOT likely to improve supportability? – Answer Requirement for highly trained individuals to perform routine maintenance The two main principles of lean manufacturing are ___________? – Answer Responsiveness to change and minimization of waste What type of contract provides for payment to the contractor of a negotiated fee that is fixed at the inception of the contract? – Answer Cost-Plus-Fixed-Fee Contract (CPFF) Using the Capability Maturity Model Integration for Development (CMMI-DEV), an organization whose process improvement capabilities were well defined both in individual

process areas and across multiple process areas, would be rated at least: - Answer Level 3 Reliability is how long an item or system will perform its function before it breaks. Good reliability will ______________________. – Answer Decrease logistics support requirements The type of contract is based upon which of the following? – Answer Allocation of cost risk between the parties The Program Management Office creates a(n) ______________ plan for each fiscal year of funding that is available for new obligations and a(n) ______________ plan for each fiscal year of funding that has not been completely expended. – Answer Obligation / expenditure When should Affordability Goals be established? – Answer Milestone A A recent ACQ 203 graduate touring a contractor facility stops to speak with a worker on the manufacturing floor. “Any

What system engineering process establishes and maintains the consistency of a system’s functional, performance and physical attributes with its requirements, design and operational information and allows technical insight into all levels of the system design throughout the system’s life cycle?

  • Answer Configuration Management What document details all aspects of the source selection process including evaluation criteria? – Answer Source Selection Plan What is the ability of systems, units, or forces to provide data, information, materiel, and services to and accept the same from other systems, units, or forces and to use the data, information, materiel, and services so exchanged to enable them to operate effectively together? – Answer Interoperability What is a characteristic of a Joint Capabilities Technology Demonstration (JCTD)? – Answer Demonstrates technology in a field environment.

When Congress does not appropriate sufficient funds to cover the cost of work to be performed under a contract, the Government may: - Answer Terminate the contract for convenience What is the Government’s basic purpose of using the Capability Maturity Model Integration (CMMI) and the associated Standard CMMI Appraisal Method for Process Improvement (SCAMPI) assessment process? – Answer To rate potential software developers on their ability to produce software at a predicted cost and schedule using a four-level capability scale and a five-level maturity scale. Which of the following technical reviews are you most likely to find only in the Production and Deployment phase? – Answer Physical Configuration Audit (PCA) The overall efforts of the Intelligence Community (IC) are administered by the ODNI, which is the: - Answer Office of the Director of National Intelligence

the following statements is correct? – Answer The ethical value of honesty requires disclosure of the adverse information relevant to the program. What is the purpose of fielding/deployment planning? – Answer To provide for a smooth introduction of the system to the user. Which of the following supportability analysis tools identifies steps, spares and materials, tools, support, equipment, and personnel skills levels? – Answer Maintenance Task Analysis (MTA) Counterintelligence (CI) organizations need information that describes the CPI and its projected use to determine the foreign collection threat to an acquisition program and subsequently the ___________________. – Answer Program Protection Plan (PPP) The _______________________________ guides activities in the Engineering and Manufacturing Development (EMD) phase. – Answer Capability Development Document (CDD)

Which of the following is a primary objective of the Defense Acquisition System? – Answer Provide measurable improvement in mission capabilities Initial Operational Test and Evaluation (IOT&E) occurs in which phase of the major capability acquisition pathway? – Answer Production and Deployment What is a primary benefit of using Commercial Off the Shelf (COTS) software for a software acquisition program? – Answer Reduce development time. What cost category are general and administrative contract expenses assigned to? – Answer Indirect Costs Select the Department of Defense’s (DoD’s) decision-support system that this statement describes: “This system is the management process by which DoD develops and acquires weapons and other systems. – Answer Defense Acquisition System

requirements are covered by at least one function and all functions are justified by a valid requirement. Manpower, measurement, methods, machinery, and materials are collectively referred to as the ______________. – Answer 5Ms of Manufacturing Technical Performance Measures (TPM) should be selected for those parameters that: - Answer Are expected to have the highest degree of risk Once unexpended Research, Development, Test and Evaluation (RDT&E) funds have expired, they can be used for _____________________. – Answer Payments or adjustments to the original obligations During prototype testing in the latter stages of the Technology Maturation and Risk Reduction (TMRR) phase a new and critical technology prototype for ground mapping and targeting radar was assessed by independent evaluators as Technology Readiness Level (TRL). Which one of the following statements can be CORRECTLY DETERMINED from the information provided? – Answer At this point in time, the

prototype radar technology has been successfully demonstrated in a relevant environment. What DoD Appropriation Category should be used for a contract modification to fund development and testing of a product improvement if the mod is meant to increase the performance capability of the system? – Answer Research, Development, Testing & Evaluation (RDT&E) appropriations Which of the following is FALSE? – Answer Exit criteria are not specific to a particular phase of an acquisition program. What does reprogramming permit the Department of Defense (DoD) to do with Budget Authority (BA)? – Answer Use BA for uses other than those originally intended by Congress Which of the following exceptions to the full funding policy would allow the Government to budget for buying three years’ worth of engines under one contract in order to save money? – Answer Multiyear Procurement

Which of the following institutions sets resource ceilings and provides Budget Authority for the Department of Defense (DoD)? – Answer Congress A program office can save 10% on overall life cycle cost by reducing the communication range KPP by 5%. Choose the greatest potential impact of the changed requirements on the Systems Engineering Functional area. – Answer Changes to the system performance specifications Defense policy requires designated systems to be certified as interoperable. In part, testing to ensure interoperability is conducted to determine if the system is: - Answer Able to provide and receive data from other systems. As part of the DoD-recommended Test and Evaluation Master Plan (TEMP) format, which of the following documents is considered to be one of the four parts of the TEMP that serve as a starting point for organizing a successful T&E program? – Answer Test and Evaluation Strategy

Which of the following is a way the government communicates requirements to a vendor during a source selection? – Answer Statement of Work (SOW) Estimates based on learning curve theory may NOT apply if ________. – Answer The design of the product keeps changing Which of these is NOT a benefit of a Federally Funded Research and Development Centers (FFRDC)? – Answer Has a vested interest in certain technologies or solutions. Maintainability is how quickly, easily and cost effectively a system can be returned to operational status after maintenance is performed. It is measured by _______________________. – Answer Mean Time To Repair (MTTR) Which enactment process activity must be passed by both houses of Congress and signed by the President before any Federal agency can incur obligations or make expenditures from the U.S. Treasury? – Answer Appropriations Bill