


















Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Online Mobile Recharge of mobile
Typology: Study notes
1 / 26
This page cannot be seen from the preview
Don't miss anything!
1.1 Background :
In the current system the user who want to recharge their mobile have to go to any shop where recharge is available. They have to go the shop and ask for the specific recharge. The shopkeeper keeps the record of the number in any book.
1.2 Objective :
This project is my effort for Online Mobile Recharge of mobile. This project useful for online recharging of mobile. This System provides recharge of many mobile companies as well as all kind of recharge are possible. This System will provide facility for customer to recharge mobile at anytime from anywhere. This System keeps the history of the past recharges. The user have to register himself.
1.3 Purpose
The purpose of the web application is the automation of mobile recharge. It provides facilities to Admin:
1.4 Scope
This website would help the customers to recharge their phones from anywhere and anytime online.
3.3. Advantages of Proposed System :
Hardware Requirement Specification Processor : Intel Pentium III or later Main Memory (RAM) : 256 MB Cache Memory : 512 KB Monitor : 17 inch Color Monitor Keyboard : 108 Keys Mouse : Optical Mouse Hard Disk : 160 GB
Software Requirement Specification
Front End/ Language: ASP.NET with C#.
Back End/Database : Nil.
Additional Tools : Visual Studio 2005/Visual Studio
2008/Visual Studio 2010.
Operating System : Windows XP Service Pack
2/Windows Vista/Windows 7/ Windows 8.
# Economic Feasibility :-
It deals with economic impact of system on the environment. It is used i.e. benefits in creating the system. We are assuming economically feasible solution. The profit is dependent on the sale of vouchers. Therefore, project is economically feasible.
# Operational Feasibility :-
It is a measure of how well a proposed system solves the problem and takes advantage of the opportunity identified during scope definition and how it satisfies the requirements identified in the requirements analysis phase of the system development.
# Legal Feasibility :-
Determine whether the proposed system conflicts with legal requirements.
System.
User.
We express our sincere gratitude to Bengal College of Engineering and Technology, Durgapur, for providing us an opportunity to undertake and complete such an interesting project report. This project is what it is greatly because he sincerely went through every bit of its text and codes and examined it thoroughly.
But we should never forget the contribution of our friends & group members the way that they took out time from their routine and told us over again what to do and what not, that is something worth mentioning. Still the list is actually about to begin. We would love to take this opportunity to tell the readers of this material that their comments, be it appreciation or criticism, would be the most valuable thing to us. That would be something we would always be thankful for.
Our thanks is also extended to our department HOD Mr. Sheikh Abdur Rahim, because without her our project would not have been successfully completed.
# List of Special Tariff Details