Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NCIDQ Practice Exam Questions - IDPX, Exams of Nursing

NCIDQ Practice Exam Questions - IDPXNCIDQ Practice Exam Questions - IDPXNCIDQ Practice Exam Questions - IDPX

Typology: Exams

2024/2025

Available from 06/19/2025

coursementor
coursementor 🇬🇧

3

(2)

523 documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NCIDQ Practice Exam Questions - IDPX
Which event triggers the issuance of a certificate of occupancy?
A. Construction work is complete except for fire alarm testing.
B. The contractor sends you a pay request for 100% complete work.
C. The owner wants to move into part of the space before the rest is finished.
D. The city inspector has inspected and finalized the job. - Correct answerAnswer:
D
What factors are MOST important in determining the locations of individual workstations
within departments?
A. Planning and design concepts
B. Company image and employee status
C. Work relationships and job adjacencies
D. Client's business and communication patterns - Correct answerAnswer: C
In which situation should you use a construction change directive?
A. To request an electrical contractor not listed by the contractor in the bid [tender]
documents
B. To request pricing for an additional receptacle per the client's request
C. To provide additional dimensions to the contractor regarding a receptacle location
D. To relocate an electrical receptacle because of revised furniture plans - Correct
answerAnswer: D
Why are addenda issued?
A. To provide additional information not included in the bid package
B. To inform potential bidders about acceptable alternates
C. To obtain additional information
D. To request a change during construction - Correct answerAnswer: A
Which light and color characteristic would be MOST effective to enhance way-finding in
a senior living facility?
A. Brightness
B. Hue
C. Contrast
D. Saturation - Correct answerAnswer: C
What portion of a contract typically outlines the designer's responsibilities to the client?
A. Scope of services
B. Project description
C. Terms and conditions
D. Compensation schedule - Correct answerAnswer: A
pf3
pf4

Partial preview of the text

Download NCIDQ Practice Exam Questions - IDPX and more Exams Nursing in PDF only on Docsity!

NCIDQ Practice Exam Questions - IDPX

Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished.

D. The city inspector has inspected and finalized the job. - Correct answer Answer:

D

What factors are MOST important in determining the locations of individual workstations within departments? A. Planning and design concepts B. Company image and employee status C. Work relationships and job adjacencies

D. Client's business and communication patterns - Correct answer Answer: C

In which situation should you use a construction change directive? A. To request an electrical contractor not listed by the contractor in the bid [tender] documents B. To request pricing for an additional receptacle per the client's request C. To provide additional dimensions to the contractor regarding a receptacle location

D. To relocate an electrical receptacle because of revised furniture plans - Correct

answer Answer: D

Why are addenda issued? A. To provide additional information not included in the bid package B. To inform potential bidders about acceptable alternates C. To obtain additional information

D. To request a change during construction - Correct answer Answer: A

Which light and color characteristic would be MOST effective to enhance way-finding in a senior living facility? A. Brightness B. Hue C. Contrast

D. Saturation - Correct answer Answer: C

What portion of a contract typically outlines the designer's responsibilities to the client? A. Scope of services B. Project description C. Terms and conditions

D. Compensation schedule - Correct answer Answer: A

Your client has a very limited budget for design services, and the scope of the project warrants mechanical and electrical engineering specification. What should you do? A. Reduce your scope to reduce the fee, and contract with a mechanical/electrical engineer for an outline specification. B. Recommend that the client work with a contractor to provide design-build services for mechanical/electrical work. C. Request that the client contract directly with a mechanical/electrical engineer for limited services to review your drawings. D. Insist that your client increase the design budget to cover the necessary

mechanical/electrical design services. - Correct answer Answer: B

Why is it necessary to indicate the placement of the proposed elevator and stairway in a preliminary plan? A. To ensure an acceptable location to meet all codes B. To verify the client's budget constraints C. To establish the structural support work required

D. To ensure accessibility and visibility to visitors - Correct answer Answer: A

In which space is emergency lighting REQUIRED? A. Elevators B. Private offices C. Egress corridors

D. Restrooms - Correct answer Answer: C

After construction on a project has begun, the client asks you to change the wallcovering originally specified to one that does not meet current code requirements. Which of the following is your BEST course of action? A. Research available products that are similar to the requested product and meet the code requirements. Present the options to the client for approval. B. Write a letter to the client stating that the change is against your professional recommendation and that you will make the change but assume no liability. C. Write a letter to the client explaining that you will not make the requested change. D. Tell the client that you will remove the wallcovering from the project and that the

client may select and install a different product after your work is completed. - Correct

answer Answer: A

How do you ensure that all signage on a construction project will be installed in the correct locations? A. Plan to be on site during installation of the signage, and specify where each sign will be placed. B. Require the signage vendor to provide detailed specifications. C. Provide a detailed takeoff along with a floor plan for installation. D. Schedule a meeting for the client or building owner to specify where signage will be

placed. - Correct answer Answer: C

C. Produce a furniture layout plan and instruct the building contractor to coordinate the installation. D. Contract with an installation consultant to supervise the installation; personally

conduct the punch list (deficiency list) review. - Correct answer Answer: A

At the end of a commercial project, why should you require the HVAC system to be balanced? A. To verify that air quality levels are within the design specifications B. To detect significant air leaks in ductwork C. To adjust air flow at each device location to meet the criteria in the engineer's design D. To determine that each office is receiving the amount of outside air required by the

design - Correct answer Answer: C

Which of the following tests is MOST important to review for performance when you are specifying the porcelain tile on a ramp surface? A. ASTM Radiant Panel Test B. ASTM Coefficient of Friction Test C. California Technical Bulletin #

D. California Technical Bulletin #133 - Correct answer Answer: B

Which of the following is a characteristic of a halogen lamp? A. Easy to install and maintain B. Cannot be dimmed C. Requires a transformer at the switch

D. Brighter than other incandescent sources - Correct answer Answer: D

What correctly defines the phrase "or equal" as it relates to specifications? A. Alternative products listed in the specification may be substituted. B. The proposed substitution of a product is allowed if the bidder believes it is an equivalent. C. Alternatives can be considered if they can be proven to be equivalent in quality. D. The proposed substitution can be made only if submitted prior to close of bids

[tenders]. - Correct answer Answer: C