


Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
This study guide provides a comprehensive set of practice questions for the nccer mobile crane certification exam. It covers a wide range of topics related to crane operation, safety, and maintenance, including load capacity, boom angles, wire rope inspection, and lifting techniques. The questions are graded a, indicating their difficulty level and relevance to the exam. This guide is an excellent resource for students preparing for the nccer mobile crane certification.
Typology: Quizzes
1 / 4
This page cannot be seen from the preview
Don't miss anything!
When determining the "gross load" the best method is: - ANS Get an accurate load weight and add the rigging By order of strength which is correct - ANS Basket, Vertical, Choker Primary purpose for a roster sheave or auxiliary boom point sheave is to: - ANS Separate the hoist line When the number of layers of rope on a drum increase the : - ANS Allowable line pull decreases What is the minimum allowable distance from the crane and power lines under 50kV? - ANS 10' Eccentric main boom tip reeving casues - ANS twisting of the boom How many randomly broken wires must there be to remove a running wire rope from service? - ANS 6 When working near power lines when is a signal person required? - ANS When crane moves within a booms length of power lines When operating truck cranes what is the most unstable allowable quadrant of operation? - ANS Side Tipping capacities of locomotive cranes are based on what % of tipping? - ANS 85% Should the load be applied when determining the proper boom angle? - ANS YES What type of rope is recommended for a tagline around powerlines - ANS Polypropylene what does two beeps of the horn indicate to people in the area - ANS forward Load radius is the distance from the center of gravity of the suspended load to the: - ANS Center of rotation What is the purpose of using a boom extension? - ANS Increase height What do a jib and boom ext. have in common - ANS Increase height
What is the minimum design factor required for a right regular lay main boom or auxiliary hoist rope?` - ANS 3. How does the operator determine if the correct load chart is being used? - ANS Matching serial numbers If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom angle remains constant you would expect the load radius to do what? - ANS To be reduced How does the operator verify the LMs boom length or load radius reading? - ANS accutal measurements If the rated capacity of the crane is above the solid line or within the shaded areas or has an asterisk next to it this means the capacity is based on: - ANS 85% tipping How many broken wires must be present in one strand of one lay for running wire rope to be removed from service? - ANS 3 In a range diagram boom length and angle can be used to determine: - ANS Load radius When making a multiple crane lift it is important for the operator to understand that - ANS the weight may increase if the other crane lands the load first Most crane manufacturers reduce the load capacity for duty-cycle operations because - ANS side loading forces may occur The proper way to calibrate a boom angle indicator is: - ANS using a level, raise the boom to horizontal and set the indicator at 0 degrees If setting up the crane by a ditch or an excavation, you should stay at least what distance from the edge? - ANS 1 1/2 times the depth of the excavation When using cable or nylon spreaders it is important to remember : - ANS the lower the spreader angle the greater the tension Backward stability is tested with - ANS Basic boom at maximum angle with no load If the rated capacity of the crane is below the solid line or outside the shaded area or has an asterisk next to it this means the capacity is based on - ANS Tipping Parts of line means - ANS the number of lines running through the load block
You are inspecting a wire rope sling, assume that you have the proper tools to check for wear on the sling, what are you looking for to remove a wire rope sling from service? - ANS wear of 1/3 the diameter of wire rope lifting lugs should be used for straight, vertical lifting only - ANS True Turnbuckles should be made of cast steel and should not be welded - ANS False Pulling synthetic slings from under a load will cause - ANS stitching to become damaged and must be removed from service Synthetic web slings are in use. Two may be joined together or connected by: - ANS using a shackle how many broken wires in one strand in one lay of a wire rope will make it necessary to replace the wire rope - ANS 3 rotation resistant wire rope cannot be used - ANS on boom hoisting systems line pull is - ANS the amount of weight a drum will hoist for a given layer of wire rope Wedge and sockets - ANS are the most common way of terminating wire rope on cranes