Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
IAS 37, a standard for accounting for provisions, contingent liabilities, and contingent assets. It explains the definition of provisions and liabilities, the recognition criteria, and the disclosure requirements. It also distinguishes provisions from other liabilities and contingent liabilities.
What you will learn
Typology: Lecture notes
1 / 12
This page cannot be seen from the preview
Don't miss anything!
The objective of this Standard is to ensure that appropriate recognition criteria and measurement bases are applied to provisions, contingent liabilities and contingent assets and that sufficient information is disclosed in the notes to enable users to understand their nature, timing and amount.
1 This Standard shall be applied by all entities in accounting for provisions, contingent liabilities and contingent assets, except:
(a) those resulting from executory contracts, except where the contract is onerous; and
(b) [deleted]
(c) those covered by another Standard.
2 This Standard does not apply to financial instruments (including guarantees) that are within the scope of IAS 39 Financial Instruments: Recognition and Measurement.
3 Executory contracts are contracts under which neither party has performed any of its obligations or both parties have partially performed their obligations to an equal extent. This Standard does not apply to executory contracts unless they are onerous.
4 [Deleted]
5 When another Standard deals with a specific type of provision, contingent liability or contingent asset, an entity applies that Standard instead of this Standard. For example, some types of provisions are addressed in Standards on:
(a) construction contracts (see IAS 11 Construction Contracts );
(b) income taxes (see IAS 12 Income Taxes );
(c) leases (see IAS 17 Leases ). However, as IAS 17 contains no specific requirements to deal with operating leases that have become onerous, this Standard applies to such cases;
(d) employee benefits (see IAS 19 Employee Benefits ); and
(e) insurance contracts (see IFRS 4 Insurance Contracts ). However, this Standard applies to provisions, contingent liabilities and contingent assets of an insurer, other than those arising from its contractual obligations and rights under insurance contracts within the scope of IFRS 4.
6 Some amounts treated as provisions may relate to the recognition of revenue, for example where an entity gives guarantees in exchange for a fee. This Standard does not address the recognition of revenue. IAS 18 Revenue identifies the circumstances in which revenue is recognised and provides practical guidance on the application of the recognition criteria. This Standard does not change the requirements of IAS 18.
7 This Standard defines provisions as liabilities of uncertain timing or amount. In some countries the term ‘provision’ is also used in the context of items such as depreciation, impairment of assets and doubtful debts: these are adjustments to the carrying amounts of assets and are not addressed in this Standard.
8 Other Standards specify whether expenditures are treated as assets or as expenses. These issues are not addressed in this Standard. Accordingly, this Standard neither prohibits nor requires capitalisation of the costs recognised when a provision is made.
9 This Standard applies to provisions for restructurings (including discontinued operations). When a restructuring meets the definition of a discontinued operation, additional disclosures may be required by IFRS 5 Non-current Assets Held for Sale and Discontinued Operations.
Definitions
10 The following terms are used in this Standard with the meanings specified:
A provision is a liability of uncertain timing or amount.
A liability is a present obligation of the entity arising from past events, the settlement of which is expected to result in an outflow from the entity of resources embodying economic benefits.
An obligating event is an event that creates a legal or constructive obligation that results in an entity having no realistic alternative to settling that obligation.
A legal obligation is an obligation that derives from:
(a) a contract (through its explicit or implicit terms);
(b) legislation; or
(c) other operation of law.
A constructive obligation is an obligation that derives from an entity’s actions where:
(a) by an established pattern of past practice, published policies or a sufficiently specific current statement, the entity has indicated to other parties that it will accept certain responsibilities; and
(b) as a result, the entity has created a valid expectation on the part of those other parties that it will discharge those responsibilities.
A contingent liability is:
(a) a possible obligation that arises from past events and whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity; or
(b) a present obligation that arises from past events but is not recognised because:
(i) it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation; or
(ii) the amount of the obligation cannot be measured with sufficient reliability.
A contingent asset is a possible asset that arises from past events and whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.
An onerous contract is a contract in which the unavoidable costs of meeting the obligations under the contract exceed the economic benefits expected to be received under it.
A restructuring is a programme that is planned and controlled by management, and materially changes either:
(a) the scope of a business undertaken by an entity; or
(b) the manner in which that business is conducted.
Present obligation
15 In rare cases it is not clear whether there is a present obligation. In these cases, a past event is deemed to give rise to a present obligation if, taking account of all available evidence, it is more likely than not that a present obligation exists at end of each reporting period.
16 In almost all cases it will be clear whether a past event has given rise to a present obligation. In rare cases, for example in a law suit, it may be disputed either whether certain events have occurred or whether those events result in a present obligation. In such a case, an entity determines whether a present obligation exists at the end of the reporting period by taking account of all available evidence, including, for example, the opinion of experts. The evidence considered includes any additional evidence provided by events after the statement of financial position date. On the basis of such evidence:
(a) where it is more likely than not that a present obligation exists at the end of the reporting period, the entity recognises a provision (if the recognition criteria are met); and
(b) where it is more likely that no present obligation exists at the end of the reporting period, the entity discloses a contingent liability, unless the possibility of an outflow of resources embodying economic benefits is remote (see paragraph 86).
Past event
17 A past event that leads to a present obligation is called an obligating event. For an event to be an obligating event, it is necessary that the entity has no realistic alternative to settling the obligation created by the event. This is the case only:
(a) where the settlement of the obligation can be enforced by law; or
(b) in the case of a constructive obligation, where the event (which may be an action of the entity) creates valid expectations in other parties that the entity will discharge the obligation.
18 Financial statements deal with the financial position of an entity at the end of its reporting period and not its possible position in the future. Therefore, no provision is recognised for costs that need to be incurred to operate in the future. The only liabilities recognised in an entity’s statement of financial position are those that exist at the end of the reporting period.
19 It is only those obligations arising from past events existing independently of an entity’s future actions (ie the future conduct of its business) that are recognised as provisions. Examples of such obligations are penalties or clean-up costs for unlawful environmental damage, both of which would lead to an outflow of resources embodying economic benefits in settlement regardless of the future actions of the entity. Similarly, an entity recognises a provision for the decommissioning costs of an oil installation or a nuclear power station to the extent that the entity is obliged to rectify damage already caused. In contrast, because of commercial pressures or legal requirements, an entity may intend or need to carry out expenditure to operate in a particular way in the future (for example, by fitting smoke filters in a certain type of factory). Because the entity can avoid the future expenditure by its future actions, for example by changing its method of operation, it has no present obligation for that future expenditure and no provision is recognised.
20 An obligation always involves another party to whom the obligation is owed. It is not necessary, however, to know the identity of the party to whom the obligation is owed—indeed the obligation may be to the public at large. Because an obligation always involves a commitment to another party, it follows that a management or board decision does not give rise to a constructive obligation at the end of the reporting period unless the decision has been communicated before the end of the reporting period to those affected by it in a sufficiently specific manner to raise a valid expectation in them that the entity will discharge its responsibilities.
21 An event that does not give rise to an obligation immediately may do so at a later date, because of changes in the law or because an act (for example, a sufficiently specific public statement) by the entity gives rise to a constructive obligation. For example, when environmental damage is caused there may be no obligation to remedy the consequences. However, the causing of the damage will become an obligating event when a new law requires the existing damage to be rectified or when the entity publicly accepts responsibility for rectification in a way that creates a constructive obligation.
22 Where details of a proposed new law have yet to be finalised, an obligation arises only when the legislation is virtually certain to be enacted as drafted. For the purpose of this Standard, such an obligation is treated as a
legal obligation. Differences in circumstances surrounding enactment make it impossible to specify a single event that would make the enactment of a law virtually certain. In many cases it will be impossible to be virtually certain of the enactment of a law until it is enacted.
Probable outflow of resources embodying economic benefits
23 For a liability to qualify for recognition there must be not only a present obligation but also the probability of an outflow of resources embodying economic benefits to settle that obligation. For the purpose of this Standard, 1 an outflow of resources or other event is regarded as probable if the event is more likely than not to occur, ie the probability that the event will occur is greater than the probability that it will not. Where it is not probable that a present obligation exists, an entity discloses a contingent liability, unless the possibility of an outflow of resources embodying economic benefits is remote (see paragraph 86).
24 Where there are a number of similar obligations (eg product warranties or similar contracts) the probability that an outflow will be required in settlement is determined by considering the class of obligations as a whole. Although the likelihood of outflow for any one item may be small, it may well be probable that some outflow of resources will be needed to settle the class of obligations as a whole. If that is the case, a provision is recognised (if the other recognition criteria are met).
Reliable estimate of the obligation
25 The use of estimates is an essential part of the preparation of financial statements and does not undermine their reliability. This is especially true in the case of provisions, which by their nature are more uncertain than most other items in the statement of financial position. Except in extremely rare cases, an entity will be able to determine a range of possible outcomes and can therefore make an estimate of the obligation that is sufficiently reliable to use in recognising a provision.
26 In the extremely rare case where no reliable estimate can be made, a liability exists that cannot be recognised. That liability is disclosed as a contingent liability (see paragraph 86).
Contingent liabilities
27 An entity shall not recognise a contingent liability.
28 A contingent liability is disclosed, as required by paragraph 86, unless the possibility of an outflow of resources embodying economic benefits is remote.
29 Where an entity is jointly and severally liable for an obligation, the part of the obligation that is expected to be met by other parties is treated as a contingent liability. The entity recognises a provision for the part of the obligation for which an outflow of resources embodying economic benefits is probable, except in the extremely rare circumstances where no reliable estimate can be made.
30 Contingent liabilities may develop in a way not initially expected. Therefore, they are assessed continually to determine whether an outflow of resources embodying economic benefits has become probable. If it becomes probable that an outflow of future economic benefits will be required for an item previously dealt with as a contingent liability, a provision is recognised in the financial statements of the period in which the change in probability occurs (except in the extremely rare circumstances where no reliable estimate can be made).
Contingent assets
31 An entity shall not recognise a contingent asset.
32 Contingent assets usually arise from unplanned or other unexpected events that give rise to the possibility of an inflow of economic benefits to the entity. An example is a claim that an entity is pursuing through legal processes, where the outcome is uncertain.
(^1) The interpretation of ‘probable’ in this Standard as ‘more likely than not’ does not necessarily apply in other Standards.
has constructed for a customer, the individual most likely outcome may be for the repair to succeed at the first attempt at a cost of 1,000, but a provision for a larger amount is made if there is a significant chance that further attempts will be necessary.
41 The provision is measured before tax, as the tax consequences of the provision, and changes in it, are dealt with under IAS 12.
Risks and uncertainties
42 The risks and uncertainties that inevitably surround many events and circumstances shall be taken into account in reaching the best estimate of a provision.
43 Risk describes variability of outcome. A risk adjustment may increase the amount at which a liability is measured. Caution is needed in making judgements under conditions of uncertainty, so that income or assets are not overstated and expenses or liabilities are not understated. However, uncertainty does not justify the creation of excessive provisions or a deliberate overstatement of liabilities. For example, if the projected costs of a particularly adverse outcome are estimated on a prudent basis, that outcome is not then deliberately treated as more probable than is realistically the case. Care is needed to avoid duplicating adjustments for risk and uncertainty with consequent overstatement of a provision.
44 Disclosure of the uncertainties surrounding the amount of the expenditure is made under paragraph 85(b).
Present value
45 Where the effect of the time value of money is material, the amount of a provision shall be the present value of the expenditures expected to be required to settle the obligation.
46 Because of the time value of money, provisions relating to cash outflows that arise soon after the reporting period are more onerous than those where cash outflows of the same amount arise later. Provisions are therefore discounted, where the effect is material.
47 The discount rate (or rates) shall be a pre-tax rate (or rates) that reflect(s) current market assessments of the time value of money and the risks specific to the liability. The discount rate(s) shall not reflect risks for which future cash flow estimates have been adjusted.
Future events
48 Future events that may affect the amount required to settle an obligation shall be reflected in the amount of a provision where there is sufficient objective evidence that they will occur.
49 Expected future events may be particularly important in measuring provisions. For example, an entity may believe that the cost of cleaning up a site at the end of its life will be reduced by future changes in technology. The amount recognised reflects a reasonable expectation of technically qualified, objective observers, taking account of all available evidence as to the technology that will be available at the time of the clean-up. Thus it is appropriate to include, for example, expected cost reductions associated with increased experience in applying existing technology or the expected cost of applying existing technology to a larger or more complex clean-up operation than has previously been carried out. However, an entity does not anticipate the development of a completely new technology for cleaning up unless it is supported by sufficient objective evidence.
50 The effect of possible new legislation is taken into consideration in measuring an existing obligation when sufficient objective evidence exists that the legislation is virtually certain to be enacted. The variety of circumstances that arise in practice makes it impossible to specify a single event that will provide sufficient, objective evidence in every case. Evidence is required both of what legislation will demand and of whether it is virtually certain to be enacted and implemented in due course. In many cases sufficient objective evidence will not exist until the new legislation is enacted.
Expected disposal of assets
51 Gains from the expected disposal of assets shall not be taken into account in measuring a provision.
52 Gains on the expected disposal of assets are not taken into account in measuring a provision, even if the expected disposal is closely linked to the event giving rise to the provision. Instead, an entity recognises gains on expected disposals of assets at the time specified by the Standard dealing with the assets concerned.
Reimbursements
53 Where some or all of the expenditure required to settle a provision is expected to be reimbursed by another party, the reimbursement shall be recognised when, and only when, it is virtually certain that reimbursement will be received if the entity settles the obligation. The reimbursement shall be treated as a separate asset. The amount recognised for the reimbursement shall not exceed the amount of the provision.
54 In the statement of comprehensive income, the expense relating to a provision may be presented net of the amount recognised for a reimbursement.
55 Sometimes, an entity is able to look to another party to pay part or all of the expenditure required to settle a provision (for example, through insurance contracts, indemnity clauses or suppliers’ warranties). The other party may either reimburse amounts paid by the entity or pay the amounts directly.
56 In most cases the entity will remain liable for the whole of the amount in question so that the entity would have to settle the full amount if the third party failed to pay for any reason. In this situation, a provision is recognised for the full amount of the liability, and a separate asset for the expected reimbursement is recognised when it is virtually certain that reimbursement will be received if the entity settles the liability.
57 In some cases, the entity will not be liable for the costs in question if the third party fails to pay. In such a case the entity has no liability for those costs and they are not included in the provision.
58 As noted in paragraph 29, an obligation for which an entity is jointly and severally liable is a contingent liability to the extent that it is expected that the obligation will be settled by the other parties.
Changes in provisions
59 Provisions shall be reviewed at the end of each reporting period and adjusted to reflect the current best estimate. If it is no longer probable that an outflow of resources embodying economic benefits will be required to settle the obligation, the provision shall be reversed.
60 Where discounting is used, the carrying amount of a provision increases in each period to reflect the passage of time. This increase is recognised as borrowing cost.
Use of provisions
61 A provision shall be used only for expenditures for which the provision was originally recognised.
62 Only expenditures that relate to the original provision are set against it. Setting expenditures against a provision that was originally recognised for another purpose would conceal the impact of two different events.
(iv) the expenditures that will be undertaken; and
(v) when the plan will be implemented; and
(b) has raised a valid expectation in those affected that it will carry out the restructuring by starting to implement that plan or announcing its main features to those affected by it.
73 Evidence that an entity has started to implement a restructuring plan would be provided, for example, by dismantling plant or selling assets or by the public announcement of the main features of the plan. A public announcement of a detailed plan to restructure constitutes a constructive obligation to restructure only if it is made in such a way and in sufficient detail (ie setting out the main features of the plan) that it gives rise to valid expectations in other parties such as customers, suppliers and employees (or their representatives) that the entity will carry out the restructuring.
74 For a plan to be sufficient to give rise to a constructive obligation when communicated to those affected by it, its implementation needs to be planned to begin as soon as possible and to be completed in a timeframe that makes significant changes to the plan unlikely. If it is expected that there will be a long delay before the restructuring begins or that the restructuring will take an unreasonably long time, it is unlikely that the plan will raise a valid expectation on the part of others that the entity is at present committed to restructuring, because the timeframe allows opportunities for the entity to change its plans.
75 A management or board decision to restructure taken before the end of the reporting period does not give rise to a constructive obligation at the end of the reporting period unless the entity has, before the end of the reporting period:
(a) started to implement the restructuring plan; or
(b) announced the main features of the restructuring plan to those affected by it in a sufficiently specific manner to raise a valid expectation in them that the entity will carry out the restructuring.
If an entity starts to implement a restructuring plan, or announces its main features to those affected, only after the reporting period, disclosure is required under IAS 10 Events after the Reporting Period , if the restructuring is material and non-disclosure could influence the economic decisions that users make on the basis of the financial statements.
76 Although a constructive obligation is not created solely by a management decision, an obligation may result from other earlier events together with such a decision. For example, negotiations with employee representatives for termination payments, or with purchasers for the sale of an operation, may have been concluded subject only to board approval. Once that approval has been obtained and communicated to the other parties, the entity has a constructive obligation to restructure, if the conditions of paragraph 72 are met.
77 In some countries, the ultimate authority is vested in a board whose membership includes representatives of interests other than those of management (eg employees) or notification to such representatives may be necessary before the board decision is taken. Because a decision by such a board involves communication to these representatives, it may result in a constructive obligation to restructure.
78 No obligation arises for the sale of an operation until the entity is committed to the sale, ie there is a binding sale agreement.
79 Even when an entity has taken a decision to sell an operation and announced that decision publicly, it cannot be committed to the sale until a purchaser has been identified and there is a binding sale agreement. Until there is a binding sale agreement, the entity will be able to change its mind and indeed will have to take another course of action if a purchaser cannot be found on acceptable terms. When the sale of an operation is envisaged as part of a restructuring, the assets of the operation are reviewed for impairment, under IAS 36. When a sale is only part of a restructuring, a constructive obligation can arise for the other parts of the restructuring before a binding sale agreement exists.
80 A restructuring provision shall include only the direct expenditures arising from the restructuring, which are those that are both:
(a) necessarily entailed by the restructuring; and
(b) not associated with the ongoing activities of the entity.
81 A restructuring provision does not include such costs as:
(a) retraining or relocating continuing staff;
(b) marketing; or
(c) investment in new systems and distribution networks.
These expenditures relate to the future conduct of the business and are not liabilities for restructuring at the end of the reporting period. Such expenditures are recognised on the same basis as if they arose independently of a restructuring.
82 Identifiable future operating losses up to the date of a restructuring are not included in a provision, unless they relate to an onerous contract as defined in paragraph 10.
83 As required by paragraph 51, gains on the expected disposal of assets are not taken into account in measuring a restructuring provision, even if the sale of assets is envisaged as part of the restructuring.
Disclosure
84 For each class of provision, an entity shall disclose:
(a) the carrying amount at the beginning and end of the period;
(b) additional provisions made in the period, including increases to existing provisions;
(c) amounts used (ie incurred and charged against the provision) during the period;
(d) unused amounts reversed during the period; and
(e) the increase during the period in the discounted amount arising from the passage of time and the effect of any change in the discount rate.
Comparative information is not required.
85 An entity shall disclose the following for each class of provision:
(a) a brief description of the nature of the obligation and the expected timing of any resulting outflows of economic benefits;
(b) an indication of the uncertainties about the amount or timing of those outflows. Where necessary to provide adequate information, an entity shall disclose the major assumptions made concerning future events, as addressed in paragraph 48; and
(c) the amount of any expected reimbursement, stating the amount of any asset that has been recognised for that expected reimbursement.
86 Unless the possibility of any outflow in settlement is remote, an entity shall disclose for each class of contingent liability at the end of the reporting period a brief description of the nature of the contingent liability and, where practicable:
(a) an estimate of its financial effect, measured under paragraphs 36–52;
(b) an indication of the uncertainties relating to the amount or timing of any outflow; and
(c) the possibility of any reimbursement.
87 In determining which provisions or contingent liabilities may be aggregated to form a class, it is necessary to consider whether the nature of the items is sufficiently similar for a single statement about them to fulfil the requirements of paragraphs 85(a) and (b) and 86(a) and (b). Thus, it may be appropriate to treat as a single class of provision amounts relating to warranties of different products, but it would not be appropriate to treat as a single class amounts relating to normal warranties and amounts that are subject to legal proceedings.