Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

General contractor fillable forms etc, Cheat Sheet of Public Health

General contractor fillable forms etc

Typology: Cheat Sheet

2022/2023

Uploaded on 01/09/2023

AVadgama
AVadgama 🇬🇧

4

(1)

7 documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
CONTROL SHEETS & FORMS
SITE HEALTH AND SAFETY INDUCTION FORM
Project Principal Contractor
Name Job Description
Company Reports to
Items Covered
Initials Date
1. Principal
Contractor
Details
i) Policies & Procedures
ii) Responsibilities & Duties
iii) Organisational Structure
iv) Communication & Consultation
v) Competence & Training
vi) H&S Goals for the project
2. Risk
Assessments /
Method
Statements
i) Site Specific Hazards
ii) Safe systems of work
iii) Permits to work
3. Emergency
Procedures
i) Fire
ii) First Aid
iii) Accident Reporting
iv) Environmental emergencies
v) Reporting requirements
4. Welfare
Arrangements
i) Amenities
ii) Facilities
5. Occupational
Health i) Provisions / issues (Weils etc.)
6. Traffic
Management
i) Speed limits
ii) Pedestrian routes
iii) Traffic management plan
iv) Parking
7. Site Rules i) Worker taken through rules
ii) Copy issued and accepted
8. Site Specific
Issues
i) Role of the Site Manager
ii) Mandatory PPE
iii) Locality risks (Schools etc)
iv) Access/Working hours
Comments: Notes:
pf2

Partial preview of the text

Download General contractor fillable forms etc and more Cheat Sheet Public Health in PDF only on Docsity!

CONTROL SHEETS & FORMS

SITE HEALTH AND SAFETY INDUCTION FORM

Project Principal Contractor Name Job Description Company Reports to Items Covered Initials Date

  1. Principal Contractor Details i) Policies & Procedures ii) Responsibilities & Duties iii) Organisational Structure iv) Communication & Consultation v) Competence & Training vi) H&S Goals for the project
  2. Risk Assessments / Method Statements i) Site Specific Hazards ii) Safe systems of work iii) Permits to work
  3. Emergency Procedures i) Fire ii) First Aid iii) Accident Reporting iv) Environmental emergencies v) Reporting requirements
  4. Welfare Arrangements i) Amenities ii) Facilities
  5. Occupational Health i) Provisions / issues (Weils etc.)
  6. Traffic Management i) Speed limits ii) Pedestrian routes iii) Traffic management plan iv) Parking
  7. Site Rules i) Worker taken through rules ii) Copy issued and accepted
  8. Site Specific Issues i) Role of the Site Manager ii) Mandatory PPE iii) Locality risks (Schools etc) iv) Access/Working hours Comments: Notes:

CONTROL SHEETS & FORMS

Signed by Employee / Contractor Date Signed by Site Manager Date