FDOT Final Estimates - Level 1 Questions and Verified Answers 2025, Exams of Construction

FDOT Final Estimates - Level 1 Questions and Verified Answers 2025

Typology: Exams

2024/2025

Available from 04/18/2025

prof-liza
prof-liza 🇬🇧

1K documents

1 / 7

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
FDOT Final Estimates - Level 1
Questions and Verified Answers 2025
"Check Levels" must be run at the start of a construction project to assure
that: - ANSConstruction will be done to design elevations & final
measurements for payment will be from the same base elevations as the
original survey.
A limerock base course is constructed in two 13-foot widths between
station 19+40.20 and station 84+50.00. What is the area of the base course
to the whole square yard? - ANS18,806 SY
According to the standard weight table, what is the TOTAL weight of the
following quantities of bolts? - ANS1,472 Ibs
An entire page of a field notebook you are using is incorrect, what do you
do to correct the situation? - ANSMark the page VOID and reference it to a
new page showing the correct information.
Aside from measuring the length of fence, you should count and document
the number of: - ANSCorner post assemblies & pull and end post
assemblies
Between Printings of the standard specifications, what does the department
publish to identify and describe changes in the specifications? -
ANSChange Orders
pf3
pf4
pf5

Partial preview of the text

Download FDOT Final Estimates - Level 1 Questions and Verified Answers 2025 and more Exams Construction in PDF only on Docsity!

FDOT Final Estimates - Level 1

Questions and Verified Answers 2025

"Check Levels" must be run at the start of a construction project to assure that: - ANSConstruction will be done to design elevations & final measurements for payment will be from the same base elevations as the original survey. A limerock base course is constructed in two 13-foot widths between station 19+40.20 and station 84+50.00. What is the area of the base course to the whole square yard? - ANS18,806 SY According to the standard weight table, what is the TOTAL weight of the following quantities of bolts? - ANS1,472 Ibs An entire page of a field notebook you are using is incorrect, what do you do to correct the situation? - ANSMark the page VOID and reference it to a new page showing the correct information. Aside from measuring the length of fence, you should count and document the number of: - ANSCorner post assemblies & pull and end post assemblies Between Printings of the standard specifications, what does the department publish to identify and describe changes in the specifications? - ANSChange Orders

Calculate the volume of the geometric shape to the nearest cubic yard: - ANS1,795 CY Completed sets of final plans should be: - ANSBound together in the order shown on the key sheet & Submitted to the district with the final estimates package. Contractors Recieve progress payments on the basis of? - ANSMonthly Progress Estimates Determine the area of the section (G) in the circle to the tenth of a square foot. (NOTE: A= pi r(squared) x (angle/360degrees) - ANS887.3 SF Determine the volume of the cone to the nearest hundredth of a cubic foot.

  • ANS42.03 CF Documentation of "per each" items is usually in the form of a tabulation by _________________________. - ANSLocation Examples of site source records include: - ANSField books, tally sheets asphalt reports, latitude & department How many square yards are in one acre? - ANS4, If you have a benchmark at an elevation of 80.25' and a back sight rob reading of 5.45', what is the height of instrument (HI)? - ANS85.70'

The various fencing post assemblies are identified by approximate ________ and are totaled in a ___________. - ANSStation; field notbook Thirteen and one-half gallons is equal to how many cubic feet? - ANS1. Cubic Feet Using the data given below, find the volume to the nearest cubic yard. The areas were determined for the cross sections at these stations: Station: Area (Sq Feet): 5091+00 287. 5091+38 302. 5091+91 298. 5092+47 295. 5092+69 288.30 - ANS1,857 CY What identification is needed to show on the front cover of a field book? - ANSFEID, Contract number, General contents of the book What is placed on the plan sheets to call particular attention to unusual conditions? - ANSPlan Notes What is the basis for payment of final quantities? - ANSSite Source records What is the method used to document significant quantity or dollar changes in a pay item? - ANSExplanation of overruns and underruns

What is the rea of the sodded section shown below? - ANS11,241 SY What should accompany final measurements so that nonstandard measurements may be interpreted accurately? - ANSSketches What should be started on the first lined page (page 1) of a field book? - ANSINDEX What software is available for calculation final pa quantities? - ANSEngineering Menu What two types of Estimates are needed to pay for the work performed by contractors? - ANSFinal & Progress Monthly What would you use to document field changes in the plans? - ANSBlack ball point pen & Black pencil When a pay item is based on truck capacity and side boards have been added to the truck body, what should you submit with the final estimates package? - ANSSketches of truck measurements When is it permissible to record only the net weight on an asphaltic concrete tabulation form? - ANSNever, gross tare must be included also When making corrections to a field book entry, you should: - ANSstrike through, initial and enter correct data and date

Which of the items listed below is NOT included in the Final Estimates package? - ANSDensity log books While on aa metric project, what method would be used to document final measured items in the field for site source record documentation. - ANSUse only metric measuring devices, no conversion is allowed You should be sure that the batch scales nd automatic printer at an asphalt plant are certified for accuracy every __________. - ANSSix Months