Notification Form for Construction Projects under the Health and Safety Executive (HSE), Lecture notes of Construction

A notification form for construction projects that need to be reported to the Health and Safety Executive (HSE) under the Construction (Design and Management) Regulations 2007. The form requires the project address, notification type, local authority information, and details about the CDM coordinator, principal contractor, and other contacts. It also asks for a brief description of the project and the construction work it includes, as well as estimates for time allowed, planned start and duration of the construction phase, and maximum number of people and contractors on site.

What you will learn

  • What type of notification is required for this construction project?
  • What are the duties of the client and CDM coordinator under the Construction (Design and Management) Regulations 2007?
  • What information about the project and construction work needs to be provided in the form?

Typology: Lecture notes

2021/2022

Uploaded on 09/27/2022

scrooge
scrooge 🇬🇧

4.5

(11)

247 documents

1 / 6

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Health and Safety
Executive
Page 1
1. Guidance notes for completion - Please complete in block capitals using black ink
5. Address of the construction site
2. Notification type
The Data Protection Act 1998 required the Health and Safety Executive (HSE) to inform you that this form may include
information about you (this is called 'personal data' in the Act) and that we are a 'data controller' for the purposes of this Act. HSE
will process these data for health, safety and environmental purposes. HSE may disclose these data to any person or
organisation for the purpose for which it was collected or where the Act allows disclosure. As data subject, you have the right to
ask for a co
py
of the data and to ask for an
y
inaccurate data to be corrected.
Is this the initial notification of the project or are you providing additional information not
previously available?
3. Date of forwarding this notification or provision of additional information?
4. Name of the Local Authority where the site is located
- -
Notification of construction project
Health and Safety
Executive
Page 1
Address
Name
Street*
District
Town*
County
Country* Postcode*
Initial Notification Additional Information
Are there multiple construction sites Yes No (Please give the main address below)
England Wales Scotland
(
Mandator
y
fields are marked with an asterisk
(
*
))
What should this form be used for
• To notify the enforcing authority for the Construction (Design and Management) Regulations 2007 of any
project that is likely to last longer than 30 days or involve more than 500 person days of construction work.
• Any day on which construction work is carried out (including holidays and weekends) should be counted,
even if the work on that day is of short duration.
• A person day is one individual, including supervisors and specialists, carrying out construction work for one
normal working shift.
• Construction work for a domestic client is not notifiable.
Who should use this form
• The CDM co-ordinator for the project.
• F10 Scanning Centre, Health and Safety Executive, c/o Central Despatch, Redgrave Court, Merton Road,
Bootle, Merseyside L20 7HS.
• If the notifiable work is on an operation railway, the notification should be sent to the Office of Rail Regulation.
Where to send the completed form
When to send this form
• As soon as practicable after the CDM co-ordinator for the project is appointed by the client.
F10 (11.11)
51328
pf3
pf4
pf5

Partial preview of the text

Download Notification Form for Construction Projects under the Health and Safety Executive (HSE) and more Lecture notes Construction in PDF only on Docsity!

Health and Safety Executive

Page 1

**1. Guidance notes for completion - Please complete in block capitals using black ink

  1. Address of the construction site
  2. Notification type**

The Data Protection Act 1998 required the Health and Safety Executive (HSE) to inform you that this form may include information about you (this is called 'personal data' in the Act) and that we are a 'data controller' for the purposes of this Act. HSE will process these data for health, safety and environmental purposes. HSE may disclose these data to any person or organisation for the purpose for which it was collected or where the Act allows disclosure. As data subject, you have the right to ask for a copy of the data and to ask for any inaccurate data to be corrected.

Is this the initial notification of the project or are you providing additional information not previously available?

**3. Date of forwarding this notification or provision of additional information?

  1. Name of the Local Authority where the site is located**

Notification of construction project

Health and Safety Executive

Page 1

Address Name Street*

District

Town* County

Country* (^) Postcode*

Initial Notification Additional Information

Are there multiple construction sites Yes^ No^ (Please give the main address below)

England Wales Scotland

(Mandatory fields are marked with an asterisk(*))

What should this form be used for

  • To notify the enforcing authority for the Construction (Design and Management) Regulations 2007 of any project that is likely to last longer than 30 days or involve more than 500 person days of construction work.
  • Any day on which construction work is carried out (including holidays and weekends) should be counted, even if the work on that day is of short duration.
  • A person day is one individual, including supervisors and specialists, carrying out construction work for one normal working shift.
  • Construction work for a domestic client is not notifiable. Who should use this form
  • The CDM co-ordinator for the project.
  • F10 Scanning Centre, Health and Safety Executive, c/o Central Despatch, Redgrave Court, Merton Road, Bootle, Merseyside L20 7HS.
  • If the notifiable work is on an operation railway, the notification should be sent to the Office of Rail Regulation.

Where to send the completed form

When to send this form

  • As soon as practicable after the CDM co-ordinator for the project is appointed by the client.

F10 (11.11) 51328

Executive

Not Required Asbestos Building Services Utilities Work

Painting&Decorating Road & Path Site Investigation Telecomm. Towers

Tunnel Water Project Other

House Factory Chimney Railways

Other

Installation Repair

Residential Commercial Other

Piling Tunnelling Underpinning Other

Bridge Road Waterway Docks

New Build - Railways New Build - Other

Shop Warehouse Factory Other

Houses 0 - 5 Houses 5 - 10 Houses 10 - 20 Houses > 20

Flats 0 - 5 storey Flats 5 - 10 storey Flats 10 - 20 storey Flats > 20 storey

Other

Commercial Residential Railway Other

Bridge Road Waterway Docks

Other

6 a. Project type - IMPORTANT: Please select ONE checkbox only from this page

Refurbishment (including Repair & Redecoration)

New Build - Residential Premises

New Build - Commercial Premises

New Build - Civil Engineering

Groundworks

Roofwork Repair

Mechanical & Electrical (M & E)

Demolition/Dismantling

For mixed projects please tick the box that reflects the primary element of the work. Additional information may be provided on the following page in section 6 b.

Refurbishment (including Repair & Redecoration) - Civil Engineering

1 - 5 storey 6

51328

Executive

**11. Name and address of any contractors already appointed

  1. Name and address of any designers already engaged
  2. Client contact details**

Postcode*

County

Town*

District

Street*

Address Name

Country*

Name*

Email Address

Telephone

Name* Address Name Street*

District

Town*

County

Country*

Telephone Email Address

Postcode*

England Wales Scotland

England Wales Scotland

Name* Address Name Street*

District

Town*

County

Country*

Telephone Email Address

England Wales Scotland Postcode*

51328

Executive

13. Please give your estimates of the following: 12. Time allowed 14. Please fill in the following sections if you have additional addresses that you need to let us know about

Time allowed by the client to the principal contractor (contractor referred to in regulation 15(b))

Planned date for the start of the construction phase*

Planned duration of the construction phase*

Maximum number of people at work on site at any one time Planned number of contractors on the site

weeks

for the planning and preparation for construction work: weeks

Name* Address Name Street*

District

Town*

County

Country*

Telephone Email Address

Postcode*

Specify the type of contact*: Client^ Designer^ Contractor

England Wales Scotland

Name* Address Name Street*

District

Town*

County

Country*

Telephone Email Address

Postcode*

Specify the type of contact*: (^) Client Designer Contractor

England Wales Scotland