Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Enterprise Recourse and Management Semester 3 assignement, Assignments of Entertainment Business Management

The challenges and objectives faced by BPCL while implementing ERP in their organization. The document highlights the importance of data management, change management, and productivity enhancement. It also discusses the role of SAP PP and SAP FICO in production planning and financial management. The document raises questions about BPCL's exposure to proprietary software and the need for continuous training and reengineering of processes. useful for students studying ERP implementation, change management, and production planning.

Typology: Assignments

2022/2023

Available from 03/27/2023

amit-vlogs
amit-vlogs 🇮🇳

2 documents

1 / 12

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
ANSWER 1
INTRODUCTION
The subsequent viewpoint connects with the objectives and targets with which BPCL started the
undertaking.
Significant among these targets were: client concentration and direction; confronting contest; and
becoming and being learning association. Here once more, the introduced information doesn’t
illuminate a few main points of interest.
The case reports that the CCSE (Place for Client care and Greatness) framed as a component of
ENTRANS was intended to deal with various executions strong angles going from ace
documents, approval, information chronicled, redesigns, and so forth. It puts information
stockroom SCM and web enablement in the new drives class. In a perfect world, for an
enormous association like BPCL, the IS plan for ERP ought to have included information
distribution center and information mining, and information management right all along.
This works out in a good way for the learning association objective. The zenith of endeavors
toward this path ought to be the development and upkeep of a BPCL Information Base (a
collection of corporate insight) with fitting access and use controls set up.
CONCEPT
According to the point of view of innovative goals/issues management, the accompanying
inquiries emerge:
•How much has BPCL presented itself to a solitary or a couple of exclusive sellers, given the
arising open standards and permit opportunity in the product domain Assuming there are ties, All
the more explicitly, regarding operating system, RDBMS, and web-empowering devices,
For example, in the open and free class, we in all actuality do have Linux (as operating system),
Java (as one of the web-empowering devices), and so on. Of different worries communicated by
the case-creators, one connects with worker efficiency. With ERP execution, for the most part
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download Enterprise Recourse and Management Semester 3 assignement and more Assignments Entertainment Business Management in PDF only on Docsity!

ANSWER 1

INTRODUCTION

The subsequent viewpoint connects with the objectives and targets with which BPCL started the undertaking. Significant among these targets were: client concentration and direction; confronting contest; and becoming and being learning association. Here once more, the introduced information doesn’t illuminate a few main points of interest. The case reports that the CCSE (Place for Client care and Greatness) framed as a component of ENTRANS was intended to deal with various executions strong angles going from ace documents, approval, information chronicled, redesigns, and so forth. It puts information stockroom SCM and web enablement in the new drives class. In a perfect world, for an enormous association like BPCL, the IS plan for ERP ought to have included information distribution center and information mining, and information management right all along. This works out in a good way for the learning association objective. The zenith of endeavors toward this path ought to be the development and upkeep of a BPCL Information Base (a collection of corporate insight) with fitting access and use controls set up. CONCEPT According to the point of view of innovative goals/issues management, the accompanying inquiries emerge: •How much has BPCL presented itself to a solitary or a couple of exclusive sellers, given the arising open standards and permit opportunity in the product domain Assuming there are ties, All the more explicitly, regarding operating system, RDBMS, and web-empowering devices, For example, in the open and free class, we in all actuality do have Linux (as operating system), Java (as one of the web-empowering devices), and so on. Of different worries communicated by the case-creators, one connects with worker efficiency. With ERP execution, for the most part

the time taken for cycles and exchanges (whether paper-based or work process situated) descends, and this ought to show two things: one, a similar number of staff will actually want to handle higher volume of cycles and exchanges as the business expands. Second, dynamic cycle will work on with regards to quality and time. Obviously, this infers that legitimate preparation on scientific abilities and suitable strengthening happens. This ought to deal with efficiency and likewise handling information downpour issues. As the organization develops, ceaseless changes in the cycles and reengineering thereof would require the administrations of the SAP experts to roll out reasonable improvements in the ERP. Work turn ought to be considered to deal with decreasing degrees of inspiration because of interlacing frameworks. BPCL's achievement is praiseworthy, taking into account the intricate planning and execution processes done to cover all tasks the nation over. Apparently, a lot of endeavors and assets have gone into change management with responsibility from the top management. While a portion of the advantages expected may have been understood, there are central points of contention and questions still to be tended to. As dissected here, these reach from the actual premise of assessing and learning advantages to better arrangement of advantages to the authoritative objectives advancing as proper to the arising industry and financial situation. BPCL, one of the main Public Area Endeavors (PSUs) in India, was working in a safeguarded market climate where valuing strategy was heavily influenced by Legislature of India (GOI), the significant partner. Yet, the aim of GOI to de-control the oil business constrained every one of the players incorporating BPCL to oversee in a quick changing serious climate. To remain serious, the organization picked the choice of dealing with its inner issues by upgrading assets. The focal point of the change was consumer loyalty with quality item and lower cost. While a significant lump of unrefined substance (raw petroleum) was imported, there was little extension for input cost control. Ideal utilization of inward assets was, in this way, one significant potential region where BPCL needed to oversee through ERP execution. This case plainly brings out issues that should have been tended to while executing ERP in an enormous association like BPCL.

ANSWER 2

INTRODUCTION

Change management's inspiration is clear: to ensure that changes give expected ceaselessly results by watching out for one of the most central bits of valuable change, person's side of change. Master gathering and use are the expansion between a thoroughly examined plan and senseless results. Considering everything, change management figures out on a few undeniable levels inside the association. Undertaking level - a powerful cutoff and expertise Project level - a benefit demand and worth creation measure applied on unambiguous drives Individual level - a structure for enabling one person to change really Change management at the endeavor level is related with ensuring that an errand achieves its coordinated unendingly results by supporting the particular changes expected by that endeavor. Right when you present one more new development, laborers ought to embrace and use it to convey regard. Right when you truly do joint exertion, agents ought to embrace and use it to convey regard. Project-level change management gives the specific strategies, plans, exercises and steps that supplement on impacted delegates and work in strategy with an endeavor sending. CONCEPT Change management, at the endeavor level, can be applied on any endeavor or drive that impacts how experts deal with their responsibilities. A few changes impact different delegates while others impact thousands. Changes can be driven by outside factors, inside factors or a mix of both. Changes can influence processes, systems, contraptions, union plans or occupation occupations (or any blend thereof). Regardless, expecting a change surmises that specialists should deal with their responsibilities incredibly (by showing better strategies for acting,

following new cycles, using new gadgets), then, there is an endeavor for project-level change management. As change management trained professionals, we really should understand what change management is and, extensively more completely, how we present what change management is to the endeavor packs we work with. While this is clear, it may not be the best system for portraying what change management is expecting we need to make liability and support for change management. Inspect the definition above appeared contrastingly similar to these: Change management is a… Benefit-affirmation instrument Procedure for ensuring achievement of on and on results Approach for driving more basic return for capital contributed Vehicle for refreshing social event and use Gadget for avoiding over the top endeavor cost Approach for working with project risk While these affirmations don't allow you unequivocally to know change management, each gives what change management is in regards to what our get-togethers (project supervisors and senior trailblazers) care about and what concerns them: benefit validation, results, results, return for cash contributed, gathering, usage, cost and hazard.

A serious resource gives focus and a singular asset. The resource can be someone in the social event or someone supporting the party, yet there ought to be someone focusing in on change management. Change management can't be applied at the endeavor level in a vacuum without risk from the endeavor pack. Clearly expressive the connection between the endeavor get-together and change management resources. Portray the positions and obligations. Work deliberately to make connection pondering a single goal — conveying the standard results and consequences of the endeavor. At the endeavor level, change management is a benefit affirmation and worth creation measure applied on unambiguous drives. It is an arranged methodology for regulating conceptualizes changed and scaled strategies and plans to drive master gathering and use. It is a framework for ensuring that an endeavor achieves coordinated benefits and results, sees benefit from starting capital undertaking, mitigates costs and risks, and makes regard. It is a strategy for ensuring that errands and drives are the more wonderful. ANSWER 3 (A) INTRODUCTION Production Planning is the most by and large saw method for managing changing demand to manufacturing capacity to make production and acquisition plans for finished things and part materials. SAP PP is an enormous module of SAP. It tracks and makes a record of the manufacturing structure streams, for example, the organized and certifiable costs. Moreover, merchandise degrees of progress from the change of harsh substance to semi-finished things. In any live Production Planning module, areas of manufacturing plants and cutoff inside the plants should be open in the plan.

CONCEPT

Meaning of Plant and cutoff regions in Production Planning- All Production ace data is made at Plant level. Planning practices are additionally performed at Plant level. Production Demand process and related merchandise improvement occurs at plant and limit area level. Virtuoso data is overall static for any connection and is right now and again changed depending on the basic. There are 5 master data to be stayed aware of in Production Planning module. The material master contains information on every one of the materials that an alliance gets, conveys, stores, and sells. It is a number incredibly sees a material master record, and therefore a material. Materials with comparative key credits are gathered and dispatched to a material sort like finished, normal substance, and so on. It is used for the going with purposes: To purchase materials For Merchandise Improvement postings, for instance, things issue or receipt in stock management and also for valid stock postings In receipt affirmation for posting referencing

The production variation is a mix of BOM and Controlling data for production. It is a linkage among BOM and Planning and picks the manufacturing framework. There can be different production assortments as indicated by different manufacturing support to make the thing. ANSWER 3(B) INTRODUCTION All SAP FICO is a fundamental community utilitarian part in SAP ERP Central Part that allows a relationship to manage its financial data. SAP FICO licenses a relationship to store a complete assortment of their financial exchange data. Specifically, the inspiration driving SAP FICO is to help affiliations produce and oversee monetary systems for examination and declaring, as well as to help reasonable business planning and course. CONCEPT SAP ERP Central Part (SAP ECC) is an on-premise experience resource planning (ERP) system

    • conventionally proposed as essentially "SAP ERP." SAP FICO helps ECC in real money related accounting and controlling cutoff points. SAP FICO incorporates two districts, SAP Finance (FI) and SAP Controlling (CO). Which is undeniably used for a specific financial cycle? SAP FI manages considering everything uncovering and accounting, while SAP CO thinks significantly more scarcely around planning and seeing costs. SAP FI and SAP CO were at first conveyed as secluded modules yet are right now so enduringly integrated that different people recommend them as basically one module. SAP FI engages relationship to offer money related clarifications for articulating and evaluation. Sorts of financial formats could integrate cash related records or advantage and hardship

announcements. SAP FI consolidates a few sub-modules that handle unequivocal accounting processes: General Record contains the connection's all's exchange data in a diagram of records. These diagram each of the records in the plan. Exchanges are kept in sub-modules that can be kept reliably with general record data. Responsibility claims gets client exchanges and arranges client accounts. Exchanges join receipt posting, credit notice posting, front and center sections, receipt partitions or executing client reports. Advance expert liabilities unite all of the exchanges with shippers and composed merchant accounts. Exchanges can integrate receipt posting, credit update posting, starting undertakings, receipt fragments, changed sections program, and executing dealer reports. Asset Accounting manages the exchanges related with the association's all's fitting assets, similar to land, structures and huge stuff. Exchanges join asset acquisitions, retirement, bargains, moves, revaluations and debasement. CONCLUSION Bank Record deals with the association's all's record exchanges and data. It can oblige all exchanges recorded on bank proclamations and difference them and the exchanges in the structure. Setting attracts the relationship to join financial reports for various parts, which gives a framework of the association's money related circumstance all around. Saves Management manages the monetary designs for the association's pay and expenses. Unequivocal Explanation Record portrays the records in SAP FI to uncover.