



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
The labor and materials required for a water supply scheme in the village of bareh. The key aspects covered include plugging pipeline leakages, providing and laying new pvc pipelines, excavation of trenches, bailing out water, and installation of pvc and ci fittings. Detailed measurements, quantities, and rates for the various tasks involved in the project. The comprehensive nature of the information suggests this document could be useful for project planning, cost estimation, and execution of a water supply infrastructure improvement initiative in the bareh village. The level of detail indicates this document is likely intended for use by engineers, contractors, or project managers responsible for the implementation of the water supply scheme.
Typology: Study notes
1 / 6
This page cannot be seen from the preview
Don't miss anything!
a) 3/28.13+28. xiv 160 mm od 4/28.
For Pipeline Dhani Gurtej singh and Tibba basti 3"
For SV 2/28. Mandhali road 2" 3/28.13+28. 4/28.49+28. a) For connecting old pipe to new pipe For fixing SV 5/28. For connecting pipe For fixing SV 6/28.
2 x 1.1 1 1.3 = 2. avg @ Rs. 169. = Excavation of tranches by manual means for leakage No L B H Qty/Rate 1 x 88.45 0.6 1.1 = 58. avg @ Rs. 99. = Laying of PVC pipeline xiv 90 mm od = 110 @ Rs. 14. = xii 63mm od = 88. @ Rs. 10. = Bailing out water from trenches For pipeline upto 300 mm 3 No = 3 @ Rs. 947. = 2 No = 2 @ Rs. 947. = P/F PVC detachable joints 90mm id 3 No = 3 @ Rs. 62 = 4 No = 4 @ Rs. 62 = P/F Sluice valve CI DF stem of SS ISI 80 mm.id 2 No = 2 @ Rs. 372. =
Unit Amount cum 12550 cum 4462 No 39808 mtr add 5% 497 mtr add 5% 598 No 12790 No 4737 Unit/CP cum 211