Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
ACI CERTIFICATION- CONCRETE FIELD-TESTING TECHNICIAN GRADE 1 CP-1 (12) EXAM QUESTIONS WITH CORRECT ANSWERS
Typology: Exams
1 / 24
This page cannot be seen from the preview
Don't miss anything!
"The temperature measuring device shall have a capacity of measuring temperature of freshly
degree, 30 degrees to 120 degrees" "The temperature measuring device shall be calibrated ______ , or whenever there is a question
degree"
"Portions of a composite sample shall be thoroughly remixed before beginning tests on the
"The maximum elapsed time allowed between obtaining the final portion of the composite
"The molding of strength test specimens shall begin within _____ minutes after fabricating the composite
Rapid evaporation"
1 cubic foot" "Concrete samples from a truck mixer must be obtained before any water or admixtures are
"The composite sample from a truck mixer must be obtained from the _____ portion of the batch.
"When the concrete contains aggregate larger than that permitted for a particular test method,
sieved" "Describe the procedure for collecting a sample of pavement concrete deposited on grade. (Oral
at least five different portions of the pile" "What is the minimum size for a sample when strength test specimens are to be molded? (Oral
"What is the maximum allowable time between obtaining the first and final portions of the
"What is required after the concrete sample has been transported to the place where tests are to
shovel" "What should be done if the concrete contains aggregate larger than is appropriate for the size of
"The measurement for slump is made from the top of the mold to what point of the concrete
specimen"
in. [12 mm]"
"Air meter bowls used for this test must conform to ASTM _____ and be calibrated for volume according
"If rodding is the method of consolidation being used, the measure must be filled in how many
"For a measure of 0.5 ft3 [14 L], what is the required number of strokes of the tamping rod for consolidation
"After completing the strike-off procedure, what must be done before weighing the measure and
"Density (Unit Weight) Calculation Known: Volume of measure = 0.504 ft3 [14.27 L or 0.01427 m3] Mass of empty measure = 19.6 lb [8.89 kg] The procedures of Method C138 are followed, and the mass of the measure plus the concrete is
"Air Content Calculation Your air meter has been damaged in transit to the job site. You do, however, possess the theoretical density that was determined in the lab; it is 151.4 lb/ft3 (2425 kg/m3). Using the
5.0% = [(2425 kg/m3 - 2305 kg/m3) / 2425 kg/m3] × 100"
StandardTestMethodforAirContentofFreshlyMixedConcretebythePressureMethod" "The pressure method of determining air content can be used on concrete containing _____
"The pressure method of determining air content cannot be used on concrete containing the
cooled blast furnace slag, or aggregates of high porosity"
hemispherical tip of the same diameter, made of steel, high-density polyethylene, or other plastic of equal or greater abrasion resistance."
straight high-density polyethylene bar, or other plastic of equal or greater abrasion resistance, at least 1/4 by 3/4 by 12 in. [6 by 20 by 300 mm]." "What is the approximate volume of the measuring cup used to add water to the air meter, in
"The sample of concrete used in this test method must be obtained in accordance with what
in. (37.5 mm)" "If the concrete sample contains aggregate larger than that allowed for this test, the sample must
"When filling the measuring bowl of the air meter, the concrete must be placed in _____ layers of
"It is necessary to tap the sides of the measuring bowl after each layer has been rodded. True or
that may be on the surface of the water"
"The direct reading of the final liquid level in the neck of the air meter, is estimated to the nearest
Calibrated cups of water are added to bring the liquid level within the graduated range" "If more than 1.25 L [2.5 pt] of alcohol are used, the final meter reading is always adjusted using
"When large amounts of alcohol are used, the direct reading will tend to indicate a __________
its contents examined" "If portions of undisturbed concrete are found in the air meter at the end of the test, _________.
Concrete Test Specimens in the Field" "ASTM Method C31 gives standardized requirements for _____, _____, _____, and _____, of test
"For cylinders with a diameter of 6 in. [150 mm] or greater, the tamping rod must be a round,
mm]"
"The container for obtaining the concrete sample used in this procedure can be a _____, _____,
board"
"Upon completion of initial curing, the test specimens may be left in their molds and sealed in
placed in water storage tanks or moist rooms with free water at a temperature of 73.5 ± 3.5 °F [23.0 ± 2.0 °C]" "During transportation, test specimens must be protected from damage due to _____, _____,
"Standard Curing is the curing method used when test specimens are to be used for
the adequacy of mixture proportions for strength, quality control" "Field Curing is the curing method used when test specimens are to be used for
being put into service; Comparison with standard cured specimens test results or with results from various in-place test methods; Adequacy of curing and protection of concrete in the Structure, or Form or shoring removal time requirements" "Cylinders that are to be field cured are stored ___________________________ and protected
concrete represented as possible; In as near as possible the same way as the formed work" "The temperature and moisture environment for field cured cylinders must be _____________________________________________________________________________.
"Cylinders made for the purpose of determining when a structure may be put into service shall be removed from the molds _________________________________________________________.
The temperature measuring device shall be capable of accurately measuring the temperature of
degrees, 120 degrees"
"A composite sample of concrete is required even if the only purpose for obtaining the sample is
Rapid evaporation" "The composite sample from a truck mixer must be obtained from the _____ portion of the batch
1/16 in"
"The outside diameter or side dimension of the vibrating element must be at least _____ but not
B. Yield per batch = 7.0 yd Y(yd3) = M/(Dx27= 27,300 lb/ (27x143.8) = 27,300 lb/ 3882.6 = 7.031 yd C. Yield per batch = 5.4 m Y(m3) = M/D = 12,383 / 2305 = 5. D. Yield per cubic yard = 27.1 ft Y(ft3/yd3) = Yf/Yd = 189.8 ft / 7 yd3 = 27.10 ft3" "Relative Yield Calculation: Using the information given and calculated in Question 22, calculate the relative yield for the
"Air Content Calculation: Your air meter has been damaged in transit to the job site. You do, however, possess the theoretical density that was determined in the lab; it is 151.4 lb/ft3 (2425 kg/m3). Using the
5.0% = [(151.4-143.8) / 151.4] x 100 Air Content Using Density in kg/m 5.0% = [( 2426- 2305) / 2426] x 100" "The pressure method of determining air content can be used on concrete containing______
"The pressure method of determining air content cannot be used on concrete containing the
cooled blast furnace slag, aggregates of high porosity" "The sample of concrete used in this test method (air) must be obtained in accordance with what
"If the concrete contains aggregate larger than the maximum allowed for this test, the sample
"What tools may be used to strike off the top surface of the concrete following consolidation of
"What must be done if there is a slight deficiency in the quantity of concrete in the measure
representative concrete before strike off" "What is the approximate volume of the measuring cup used to add water to the air meter, in
volume (65% by weight)"
"The sample of concrete used in this test method must be obtained in accordance with what
"If the concrete sample contains aggregate larger than that allowed for this test (C173), the
"The initial quantity of water and alcohol added to the air meter can be poured directly into the
"For cylinders with a diameter of 6 in. [150 mm] or greater, the tamping rod must be a round,
"The container for obtaining the concrete sample used in this procedure can be a _____, _____,
"A 6 by 12 in. cylinder mold can be used for concrete containing aggregate with particles not
"The sample of concrete used in molding test specimens must be obtained in accordance with
"For concrete with a slump of less than 1 in. the test specimens must be consolidated by _____.
"If the concrete is to be consolidated by vibration, a standard 4 by 8 in. cylinder mold must be
"When rodding each upper layer of concrete in a cylinder, the tamping rod should penetrate into
"When using an internal vibrator to consolidate a 6 by 12 in. [150 mm by 300 mm] compressive
"When consolidating a flexural strength test specimen by rodding, rod one stroke for each _____
"When internal vibration is used to consolidate a standard flexural strength test specimen, the technician should inset the vibrator at intervals not exceeding ______ along the center line of the
"Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have an initial
"Up to 48 hours after molding, test specimens that are to be standard cured shall be stored in a
"Upon completion of initial curing, the test specimens may be left in their molds are sealed in
"During transportation, test specimens must be protected from damage due to _____, and
"Standard Curing is the curing method used when test specimens are to be used for _________.
mixture proportions for strength, and quality control"
service, comparison with standard cured specimens test results or with results from various in- place test methods, adequacy of curing and protection of concrete in the structure, and dorm or shoring removal time requirements"
possible, in as near as possible the same way as the formed work."
"What must occur before a sample of concrete can be taken from a revolving drum mixer? (Oral
"Describe the different procedures that can be used to collect a sample of concrete from a
receptacle through the entire discharge stream, Completely divert the discharge stream into a sample container" "What are the required steps for collecting a sample of concrete from a stationary or revolving
the portions at regularly spaced intervals, Take the portions from the middle of the batch" "Start the tests for slump, temperature, and air content within how many minutes after obtaining
"Start molding specimens for strength tests within how many minutes after fabricating the
wind, rapid evaporation, and contamination"
Concrete"
layer throughout its depth; on the second and final layers, the rod should penetrate into the previous layer approximately 1 in. [25 mm]" "When rodding the bottom layer, the tamping rod must be _____ to uniformly distribute the
"What must be done if the concrete drops below the top of the slump mold while the top layer is
above the top of the mold at all times"
area surrounding the base of the mold"
Yield, and Air Content (Gravimetric) of Concrete"
[16 mm]"
hemispherical tip"
"The outside diameter or side dimension of the vibrating element must be at least _____ but not
"When rodding the middle and the top layers, the tamping rod should penetrate into the layer
"If vibration is the method of consolidation, the measure must be filled in _____ approximately
"If, after consolidation of the final layer, the concrete level is 1/2 in. (13 mm) above the top of the
excess concrete with a trowel or scoop" "After consolidation of the final layer, an excess of concrete _____ above the top of the measure
"Yield Calculations For a design batch of 7.0 yd3 [5.4 m3], the total mass of all materials batched was 27,300 lb [12,383 kg]. Using the density of the concrete as determined in Question 21, calculate: a) The yield per batch in ft b) The yield per batch in yd c) The yield in m
b. Yield per batch = 7.0 yd c. Yield per batch = 5.4 m