
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
An abstract of a project implementing plasser’s quick relaying system (pqrs) for track renewal. The system, designed by plasser’s india limited, can relay 130m of track in an hour, reducing traffic disruption, labor requirements, and achieving higher precision. The project also covers the preparation of sleepers in new panels, track machine features and principles, and necessary works before, during, and after deployment.
Typology: Exercises
1 / 1
This page cannot be seen from the preview
Don't miss anything!
In earlier days after the life time of the Sleepers, Rails relaying work is carried out manually by which the time for blocking traffic is higher, it requires a large work force and finally quality and heavier track structure with highest precision cannot be achieved. So in this project we are implementing a new system for renewal of existing track which is called as Plasser’s Quick Relaying System (PQRS) designed by Plasser’s India limited. It has a capacity of relaying the track of 130m in just one hour. The Proposed System can overcome the maximum drawbacks of the conventional method of track renewal. Our project not only deals with method of relaying but also deals with the method of Preparation of sleepers in the new panels. It also includes the features and principles of track machines, works required before, during, and after deployment of track machines, rules for moment and working of track machines, planning operation and monitoring of track machines.